中韩高清无专码区2021曰_色翁荡熄又大又硬又粗又视频图片_波多野结衣乳巨码无在线观看_国产91福利在线播放_国产人妻人伦精品_马来西亚潜水天堂_黄色免费网站下载_免费看黄网站黄污污污热门软件_小莹客厅激情46章至50章视频

China Drainage board - China Supplier
China Drainage board - China Supplier

Drainage board

Price:Negotiable
Industry Category: Construction & Building Materials/Waterproof & Moisture-Proof Materials/Waterproof & Moisture Proof Materials
Product Category:
Brand:
Spec:


Contact Info
  • Add:山東省肥城市高新技術(shù)開發(fā)區(qū), Zip: 271608
  • Contact: 王經(jīng)理
  • Tel:0538-5359072
  • Email:[email protected]

Other Products

Description
Additional Information

The drainage board is made from high-impact polystyrene (HIPS) or polyethylene plastic baseboard through punching to form conical protrusions (or hollow cylindrical porous structures). The top surface of the conical protrusions is bonded with a layer of filter geotextile to prevent soil particles from passing through, thereby avoiding blockage of the drainage channels and ensuring smooth water flow. Traditional drainage methods use bricks and tiles as a filter layer, with a considerable amount of pebbles or crushed stones as a water filtration layer, directing water to a specified location. Nowadays, replacing the pebble filtration layer with drainage boards saves time, labor, energy, reduces investment, and also decreases the load on buildings.

Characteristics: A good drainage system is crucial for the construction period of civil engineering and the normal use and longevity of structures. The HW-type drainage board, together with a porous seepage pipe, forms an effective drainage system. The cylindrical porous drainage board and geotextile also constitute a drainage system, thereby creating a system with functions of seepage, water storage, and drainage.

Application Areas:

Landscaping Projects: Garage roof greening, rooftop gardens, football fields, golf courses, bathing beach projects

Municipal Engineering: Road subgrades, subway tunnels

Construction Engineering: Upper or lower layers of building foundations, interior and exterior walls of basements, roof waterproofing and insulation layers, etc.

Transportation Engineering: Highway and railway subgrades, embankments, and slope protection layers

Laying Procedures:

1. Clean the laying site of debris, level with cement to ensure no uneven areas; outdoor garage roofs and rooftop gardens require a slope of 2-5‰.

2. For rooftop greening and outdoor garage roof greening, porous seepage pipes can be used in conjunction to collect water drained from the drainage board and direct it to nearby sewer pipes or city drains.

3. For waterproofing basement floors, elevate the floor above the foundation, i.e., install a layer of drainage board before constructing the floor, with the protrusions facing downward and peripheral blind ditches to prevent groundwater from rising. Seepage water naturally flows through the space of the drainage board into the peripheral blind ditches and then into the sump.

4. For waterproofing interior basement walls, lay drainage boards on the main wall surface with the protrusions facing the wall. Then, build a single wall outside the drainage board or use wire mesh with cement to protect the drainage board, allowing seepage water from outside the wall to flow directly downward into the blind ditches and then to the sump.

5. When laying drainage boards, ensure that no soil, cement, sand, or other debris enters the front space of the drainage board to keep the drainage channels clear.

6. During laying, take protective measures as much as possible. For roofs or outdoor garage applications, backfill soil promptly to prevent wind from disturbing the drainage boards and affecting laying quality. For basement and interior wall waterproofing, apply a protective layer quickly to prevent damage to the drainage boards by people or objects.

7. If the backfill soil is cohesive, it is ideal to lay 3-5 cm of sand on top of the geotextile to facilitate filtration. If the backfill is nutrient-rich or lightweight soil, no additional sand layer is needed as such soil is loose and filters water easily.

8. When laying drainage boards, overlap the edges by 1-2 connection points, or align two baseboards and overlap the geotextile above. The key is to prevent soil from entering the drainage channels of the board, ensuring smooth drainage.

Industry Category Construction & Building Materials/Waterproof & Moisture-Proof Materials/Waterproof & Moisture Proof Materials
Product Category
Brand:
Spec:
Stock: 100000
Manufacturer:
Origin: China / Shandong / Taianshi
Storefront Language: English Chinese English
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 道孚县| 潜江市| 周口市| 巩义市| 邵武市| 马关县| 安龙县| 应用必备| 通山县| 汶川县| 获嘉县| 铁岭市| 孟津县| 亚东县| 上虞市| 施甸县| 从化市| 鹤岗市| 板桥市| 曲麻莱县| 平南县| 汾阳市| 曲沃县| 宜城市| 潜江市| 佳木斯市| 建昌县| 收藏| 湖州市| 道孚县| 红原县| 新丰县| 开封县| 沧州市| 鄱阳县| 洛扎县| 彝良县| 渝中区| 陵川县| 顺昌县| 吴旗县|