中韩高清无专码区2021曰_色翁荡熄又大又硬又粗又视频图片_波多野结衣乳巨码无在线观看_国产91福利在线播放_国产人妻人伦精品_马来西亚潜水天堂_黄色免费网站下载_免费看黄网站黄污污污热门软件_小莹客厅激情46章至50章视频

China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier
China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier

Shield synchronous grouting material for subway shield segment synchronous grouting

Price:Negotiable
Industry Category: Chemicals/Catalysts & Additives/Sizing Agents
Product Category:
Brand:
Spec:


Contact Info

Other Products

Description
Additional Information

A dry mixture processed from graded dry aggregates, cementitious materials, fillers, admixtures, etc., used for shield grouting engineering.

Shield synchronous grouting material, when mixed with water in a certain proportion and stirred into a uniform slurry, is used alone or with supporting components for backfill grouting behind the shield. Its purpose is to effectively control ground settlement during shield construction, ensure the early stability of the segment lining, and form the first line of defense for lining waterproofing.

I. Product Features

1. High fluidity and excellent filling performance.

2. Cures within a specified time and is not diluted by groundwater before curing.

3. Construction is not restricted by site conditions, with simple procedures, allowing parallel work with other trades, easy operation, and fast construction speed.

II. Scope of Application

Tunnel shield construction, rail transit, stations, etc.

III. Performance Indicators

Note: Shield synchronous grouting material complies with the standard: DB11T 1608-2018 "Technical Specification for Application of Ready-Mixed Shield Grouting Material".

IV. Construction Process

1. During grouting, the shield tail gap should be completely filled and compacted, with a filling coefficient not less than 1.3.

2. The grouting pressure should match the ground stress at the burial depth of the tunnel axis, and the pressure should be uniform.

3. Type I slurry (thin slurry) should be used up within the apparent setting time, and Type II slurry (thick slurry) should be used up within the initial setting time.
Winter Construction

1. Comprehensive measures should be taken during winter construction to ensure slurry quality, and a suitable winter construction plan should be in place.

2. Fluid pipelines such as water tanks and water pipes matched with the mixing machine should be insulated.

3. The slurry pipelines from the mixing machine to the storage tank, as well as the storage tank itself, should be insulated.

4. During winter construction, after each operation, water in equipment and pipelines should be drained promptly to avoid freezing and damaging the equipment.

Industry Category: Chemicals/Catalysts & Additives/Sizing Agents
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 项城市| 福州市| 孙吴县| 柘荣县| 巴青县| 综艺| 于田县| 毕节市| 上林县| 田阳县| 调兵山市| 高清| 苍梧县| 湘阴县| 镇远县| 邳州市| 铜川市| 连山| 汉阴县| 永福县| 芜湖县| 云霄县| 武宣县| 桐柏县| 迁西县| 安庆市| 北京市| 安溪县| 读书| 汶上县| 锡林浩特市| 哈尔滨市| 岳阳市| 甘南县| 天全县| 柘荣县| 余江县| 江安县| 濉溪县| 沧源| 淳化县|