中韩高清无专码区2021曰_色翁荡熄又大又硬又粗又视频图片_波多野结衣乳巨码无在线观看_国产91福利在线播放_国产人妻人伦精品_马来西亚潜水天堂_黄色免费网站下载_免费看黄网站黄污污污热门软件_小莹客厅激情46章至50章视频

China Step Bridge - China Supplier
China Step Bridge - China Supplier

Step Bridge

Price:Negotiable
Industry Category: Construction & Building Materials/Others/Bridge Expansion Joints
Product Category:
Brand:
Spec:


Contact Info
  • Address:武漢市硚口區(qū)古田二路海爾國際廣場9號樓1910, Zip:
  • Contact: 徐遠龍
  • Tel:15997491217
  • Email:[email protected]

Other Products

Description
Additional Information

What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably along walls, columns, or beams.

2. Based on the installation path of cable trays and wireways, the civil and structural engineering teams should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process engineering, plumbing, and electrical disciplines is essential.

3. The wiring design for underground concealed metal wireways must be closely coordinated with civil engineering, with routes and equipment selection rationally determined according to structural types and building layouts.

4. Cables of different voltages and purposes should not be installed on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different ratings are installed in the same cable tray, a partition should be added in between for isolation.

5. When no additional concentrated loads are considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray should be calculated based on the even distribution of cable weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) Cable trays should be above corrosive liquid pipelines.

(2) Cable trays should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, cable trays should be above the pipelines.

(4) When flammable and explosive gases are lighter than air, cable trays should be below the pipelines.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should meet relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category: Construction & Building Materials/Others/Bridge Expansion Joints
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經營性-2023-0192
ChatGlobal Chat Now 中江县| 唐山市| 建宁县| 金寨县| 黑水县| 宁明县| 邹城市| 佛学| 通州市| 开平市| 广元市| 漳浦县| 台北县| 电白县| 分宜县| 如东县| 紫阳县| 金门县| 金平| 青岛市| 闽清县| 萨迦县| 特克斯县| 德江县| 电白县| 女性| 玉林市| 富锦市| 错那县| 邓州市| 民勤县| 正安县| 当涂县| 广平县| 余江县| 那曲县| 灵武市| 丹阳市| 英山县| 金堂县| 朝阳区|